Item added to your cart
Troy Lee Designs
Troy Lee Designs Flowline Superlyte MTB Short - Steel Blue
Troy Lee Designs Flowline Superlyte MTB Short - Steel Blue
Product ID: GM031325-395
Only 1 Items Left
Shop all Troy Lee Designs | Shop all MTB Shorts
View full detailsDescription
Troy Lee Designs Flowline Superlyte MTB Short
Casual comfort meets trail-ready performance with the Flowline Superlyte MTB Short. Designed for all-day wear, this lightweight, breathable, and moisture-wicking short is perfect for both town and trail. Featuring 4-way stretch recycled fabric, a premium jacquard elastic waistband, and Bluesign®-approved materials, the Flowline Superlyte is built for comfort, sustainability, and performance.
Key Features
- Lightweight & Breathable – Made from 89% recycled polyester and 11% spandex for unrestricted movement.
- 4-Way Stretch Fabric – Moves with you for ultimate flexibility on and off the bike.
- Moisture-Wicking & Quick-Dry Interior – Keeps you cool and dry during long rides.
- Bluesign® Approved Materials – Environmentally friendly, sustainable fabric construction.
- Premium Jacquard Elastic Waistband – Provides a secure and comfortable fit.
- Mid-Knee Length (20 ¾" Outseam) – Ideal coverage for pedaling efficiency and casual style.
- Functional Pockets – Two front pockets with bonded interiors for durability, plus a secure side pocket for your phone or essentials.
- Locking YKK Zipper with Snaps – Secure and durable closure system.
Whether you're ripping through trails or cruising around town, the Flowline Superlyte MTB Short delivers effortless style, comfort, and performance.
You Might Also Like

Ratings & Reviews
Overall rating: 0.0 / 5 from 0 reviews.
AI Generated Review Summary
Summary topics
Review topics: [].
Review highlights
Reviews
Q&A
Overall rating: 0.0 / 5 from 0 reviews.
AI Generated Review Summary
Summary topics
Review topics: [].
Review highlights
Reviews
Q&A
- Choosing a selection results in a full page refresh.
- Opens in a new window.