Skip to product information

Troy Lee Designs

Troy Lee Designs Flowline SE MTB Helmet - Trooper - Titanium

Troy Lee Designs Flowline SE MTB Helmet - Trooper - Titanium

Regular price $190.00
Sale price $190.00
Troy Lee Designs Logo
Shipping calculated at checkout.

Color
Size

Product ID: GM031325-145

Earn

Only 1 Items Left

 

Shop all Troy Lee Designs   |   Shop all MTB Helmets

View full details

Description

Troy Lee Designs Flowline SE MTB Helmet

The Troy Lee Designs Flowline SE MTB Helmet combines cutting-edge safety, premium comfort, and a sleek minimalist design to deliver top-tier performance for trail riders and eMTB enthusiasts. Equipped with Mips® B-Series Rotational Impact Protection, an extended coverage shell, and a Five-Star Safety Rating from Virginia Tech, this helmet ensures unmatched protection on every ride.

Key Features

  • Mips® B-Series Protection – Reduces rotational impact forces in the event of a crash.
  • eMTB Certified – Built for high-speed, high-intensity rides.
  • 3-Way Adjustable Screwless Visor – Easily customized for sun and debris protection.
  • Full 360° Fit Retention System – Adjustable for a secure and personalized fit.
  • 14 Vents – Optimized airflow for maximum cooling.
  • Full Wrap In-Mold Construction – Lightweight, durable, and impact-resistant.
  • Fidlock® Magnetic Buckle System – Quick and secure one-handed closure.
  • Side Strap Adjusters – Easy, on-the-go fit adjustments.

For riders who demand top-tier safety, comfort, and ventilation, the Flowline SE MTB Helmet is a performance-driven trail essential, designed to keep you cool, comfortable, and protected on every adventure.

You Might Also Like

Ratings & Reviews

>