Item added to your cart
Troy Lee Designs
Troy Lee Designs Flowline SE MTB Helmet - Badge - Camo Blue
Troy Lee Designs Flowline SE MTB Helmet - Badge - Camo Blue
Product ID: GM031325-139
Shop all Troy Lee Designs | Shop all MTB Helmets
View full detailsDescription
Troy Lee Designs Flowline SE MTB Helmet
The Troy Lee Designs Flowline SE MTB Helmet combines cutting-edge safety, premium comfort, and a sleek minimalist design to deliver top-tier performance for trail riders and eMTB enthusiasts. Equipped with Mips® B-Series Rotational Impact Protection, an extended coverage shell, and a Five-Star Safety Rating from Virginia Tech, this helmet ensures unmatched protection on every ride.
Key Features
- Mips® B-Series Protection – Reduces rotational impact forces in the event of a crash.
- eMTB Certified – Built for high-speed, high-intensity rides.
- 3-Way Adjustable Screwless Visor – Easily customized for sun and debris protection.
- Full 360° Fit Retention System – Adjustable for a secure and personalized fit.
- 14 Vents – Optimized airflow for maximum cooling.
- Full Wrap In-Mold Construction – Lightweight, durable, and impact-resistant.
- Fidlock® Magnetic Buckle System – Quick and secure one-handed closure.
- Side Strap Adjusters – Easy, on-the-go fit adjustments.
For riders who demand top-tier safety, comfort, and ventilation, the Flowline SE MTB Helmet is a performance-driven trail essential, designed to keep you cool, comfortable, and protected on every adventure.
You Might Also Like
