Item added to your cart
Troy Lee Designs
Troy Lee Designs Flowline MTB Helmet - Point - Gray-Gold
Troy Lee Designs Flowline MTB Helmet - Point - Gray-Gold
Product ID: GM031325-162
Only 1 Items Left
Shop all Troy Lee Designs | Shop all MTB Helmets
View full detailsDescription
Troy Lee Designs Flowline MTB Helmet
The Troy Lee Designs Flowline MTB Helmet delivers top-tier protection, comfort, and ventilation in a sleek, minimalist design—all at an affordable price. Engineered with Mips® B-Series Rotational Impact Protection, a full 360-degree fit retention system, and extended coverage, this helmet ensures premium safety and all-day comfort for trail riders.
Key Features
- Mips® B-Series Protection – Reduces rotational forces in the event of a crash.
- 3-Way Adjustable Screwless Visor – Easy customization for sun and debris protection.
- Full 360° Fit Retention System – Secure, comfortable, and adjustable fit.
- 14 Vents – Maximized airflow to keep you cool.
- Full Wrap In-Mold Construction – Lightweight yet highly protective shell.
- Extended Coverage – Increased protection for trail riding.
- Side Strap Adjusters – Quick and easy fit adjustments.
With a Five-Star Safety Rating from Virginia Tech, the Flowline MTB Helmet is built for riders who demand reliable performance, comfort, and protection—without breaking the bank.
You Might Also Like
